|
Residential Standard Offer Program
Small Project Sponsor Limit Is Now $40,000
RSOP APPLICATIONS ARE CLOSED
**IMPORTANT PROGRAM INFORMATION/CHANGES**
Beginning with measures reported on the APRIL INVOICE, all duct efficiency installations MUST provide the following information in the notes section for each customer, in addition to the information currently required:
- The type of duct system (i.e. flex, duct board, sheet metal, or combination)
- How registers were sealed (from the conditioned space or from the attic)
- The number of duct joints sealed in the attic (or other unconditioned space)
- The location of the air handler (i.e. attic, closet, garage)
A standardized field installation document is available on the downloads/tools page of the website for your use. If you are currently using a form of your own design, that may be submitted in lieu of adding detailed notes in the database.
- Sites and measures will be disallowed from the invoices if customer's signatures and dates are not in the appropriate places on Host Customer Agreements.
- Invoices will be subject to adjustment if Measure information is incorrectly reported.
- Invoices must be submitted by the last day of each month.
Please check the website periodically for program and budget updates. Thank you!
Links:
Program Manual
Downloads/Tools
|
Hard-to-Reach Stand Offer Program
BUDGET RESERVATIONS ARE CLOSED
**IMPORTANT PROGRAM INFORMATION/CHANGES**
Beginning with measures reported on the APRIL INVOICE, all duct efficiency installations MUST provide the following information in the notes section for each customer, in addition to the information currently required:
- The type of duct system (i.e. flex, duct board, sheet metal, or combination)
- How registers were sealed (from the conditioned space or from the attic)
- The number of duct joints sealed in the attic (or other unconditioned space)
- The location of the air handler (i.e. attic, closet, garage)
A standardized field installation document is available on the downloads/tools page of the website for your use. If you are currently using a form of your own design, that may be submitted in lieu of adding detailed notes in the database.
- Sites and measures will be disallowed from the invoices if customer's signatures and dates are not in the appropriate places on Host Customer Agreements.
- Invoices will be subject to adjustment if Measure information is incorrectly reported.
- Invoices must be submitted by the last day of each month.
Please check the website periodically for program and budget updates. Thank you!
The Hard-to-Reach Standard Offer Program (SOP) was developed by AEP to provide incentives to suppliers and installers of energy efficiency services to effectuate electric energy efficiency projects at AEP hard-to-reach customers residences. The primary objective of these programs is to achieve cost-effective reduction in peak summer electric demand. This performance-based program includes monetary incentive payments for "deemed" energy savings generated by installing energy efficiency measures.
Program details will be available in our program manual, which will be available for downloaded via the left menu bar by clicking on Program Manual or from our downloads page. AEP will accept applications for peak demand and energy savings with "project sponsors" who are typically energy efficiency service firms such as air conditioning contractors, insulation installers, lighting contractors or national energy service companies.
|